When to Print Investment-Casting Patterns: SLA, DLP and Material Jetting Compared


Published: 

2024-09-24

Five components compare wax injection with three printing routes, including washing and support removal. Cost/time crossovers and simplified payback are evaluated at 10%, 50% and 75% utilization.

Figure 3 . Techno-economic framework for rapid investment casting.

Figure 3 . Techno-economic framework for rapid investment casting.

Comparison Boundaries, Components and Complete Pattern Costs

Printed patterns avoid some metal-tool production but are not cheaper/faster at every volume. This rapid-investment-casting (RIC) analysis compares SLA, DLP and material jetting (MJ, specifically PolyJet) against wax injection (IM). The boundary is resin/wax patterns and cores ready for assembly, including post-processing, not the complete shellmaking, pouring and heat-treatment cost of metal castings.

Five components—Buckle, Stud, Pendant, Impeller and Manifold—span jewelry, fashion and mechanical sizes/shapes. PreForm/GrabCAD select orientations and NX supplies geometry. Size changes nesting capacity, height and supports, so jewelry economics cannot transfer directly to impellers. Geometry and utilization are joint scenario variables, rather than nominal printer speed alone.

The framework defines technologies, maps material/energy/process flows, builds analytical costs, and calculates crossover points (COP) and payback periods (PBP). COP is equal cost/time at a batch quantity, with advantage changing across it. PBP estimates investment recovery. AACE Class 3 accuracy of −20% to +30% targets selection/budget comparison rather than a final enterprise quotation.

SLA cures with a scanning source, DLP projects a layer, and MJ deposits UV-cured droplets with different body/support materials possible. Figures 4–7 map each route. Injection has tooling costs difficult to spread at low volume; printing avoids equivalent tooling but may incur greater material, occupancy and finishing costs. Preparation and ongoing batch production both matter.

Figure 4 . Wax-injection activities, material and energy flows.
Figure 4 . Wax-injection activities, material and energy flows.
Figure 5 . SLA pattern workflow.
Figure 5 . SLA pattern workflow.
Figure 6 . DLP pattern workflow.
Figure 6 . DLP pattern workflow.
Figure 7 . Material-jetting pattern workflow.
Figure 7 . Material-jetting pattern workflow.

Eq. (1): C_total = C_machine+C_material+C_labour+C_energy. Eq. (2) multiplies setup/nesting time by labor rate; nesting occurs for the first job, setup can repeat. Eq. (3) multiplies machine rate by build time. Eq. (5) divides machine rate into depreciation, maintenance and general production charges. Fewer annual operating hours spread fixed annual expense across fewer productive hours.

Eq. (6) includes part/support volume, density and unit price, not net pattern alone. Eq. (7) uses power, electricity price and build time. SLA/DLP require washing, mechanical support removal and sanding when needed. MJ adds quick hand washing and soluble-support treatment, including machine, solution, handling and energy. Print completion is not delivery-ready completion.

Nesting is 15 min and setup 5 min for all routes. LF 10%, 50%, 75% correspond to 876, 4380, 6570 h/year, representing underuse, normal and optimistic use. Table 2 includes material/machine/rate data, labor 30 €/h and electricity 0.5 €/kWh. PolyJet rate falls from 62.22 €/h at LF10 to 12.44 at LF50 and 8.30 at LF75, showing utilization’s effect on allocation.

Table 3 gives SLA/DLP washing 0.25 h and support removal for Buckle/Stud/Pendant/Impeller/Manifold of 0.03/0.05/0.08/0.2/0.45 h. MJ hand washing is 0.003/0.003/0.006/0.008/0.011 h and soaking 1/1/2/2/4 h. Brief operator contact does not represent completion of longer equipment occupancy, especially for larger components.

Inputs combine specifications, prices, literature and technician measurements. Single-pendant worst-case checking gives DLP error about −20%/+20% at LF10, meeting Class 3. Some speed/material/price inputs are assumed or documented, not fresh machine-capacity experiments. Results change with machines, resin prices and settings.

Batch Crossovers, Utilization and Sensitivity

Table 5 gives all five parts, three technologies and three LFs. At LF50, Buckle cost COPs for DLP/SLA/MJ are 4947/4668/8965; Stud 938/868/2795. Efficient nesting favors MJ for these small parts. Pendant changes to 438/419/385, showing that even decorative applications need different choices.

Table 5. Cost crossover quantities versus wax injection
 

LF 10%

LF 50%

LF 75%

DLP

SLA

Polyjet

DLP

SLA

Polyjet

DLP

SLA

Polyjet

Buckle

4406

2606

4491

4947

4668

8965

4982

4842

9827

Stud

570

439

784

938

868

2795

964

963

3040

Pendant

398

174

92

438

419

385

441

439

409

Impeller

48

41

15

68

68

43

71

77

45

Manifold

64

44

13

77

76

39

77

82

42

Mechanical COPs are lower. LF50 Impeller is 68/68/43 and Manifold 77/76/39. At LF10 these become 48/41/15 and 64/44/13; at LF75, 71/77/45 and 77/82/42. Larger size/volume changes tooling amortization versus printing. Thousands-of-pieces jewelry thresholds are not mechanical-part thresholds.

Figure 8 . Stud cost crossover at LF 50%.
Figure 8 . Stud cost crossover at LF 50%.

Time COP differs from cost. Table 6 DLP/SLA/MJ values are Buckle 504/166/2348; Stud 216/82/987; Pendant 536/27/104; Impeller 10/0/2; Manifold 30/1/3. Zero means no positive-volume time advantage in the modeled range, not inability to manufacture. SLA impellers can remain cost-attractive at small quantities without being faster.

Table 6. Time crossover quantities versus wax injection
 

DLP

SLA

Polyjet

Buckle

504

166

2348

Stud

216

82

987

Pendant

536

27

104

Impeller

10

0

2

Manifold

30

1

3

Figure 9 . Stud manufacturing-time crossover.
Figure 9 . Stud manufacturing-time crossover.

Normalized radar charts show DLP balanced for pendants/mechanical parts, MJ strong for small jewelry and SLA still relevant at low batches but limited by build speed. Raising LF50 to LF75 increases Buckle MJ cost COP from 8965 to 9827. These rankings concern the specified machines/materials, not all vendors or permanent technology superiority.

Figure 10 . Normalized costs across three utilization levels.
Figure 10 . Normalized costs across three utilization levels.

PBP estimates full pattern time, annual capacity from operating hours, and a common part value based on injection cost with tooling allocated at COP batches. Investment is divided by modeled cash flow. This simplified PBP is not net return after every factory expense, financing and order risk. Actual product mix and discount assumptions need further analysis.

At LF50, Table 7 DLP PBPs are 0.24/0.24/0.05/0.06/0.03 years, SLA 0.92/0.77/1.13/0.84/0.74, PolyJet 0.77/1.45/2.25/1.85/1.65. Buckle DLP changes from 1.13 years at LF10 to 0.16 at LF75; SLA 3.24 to 0.62. These show allocation/price effects, not guaranteed real net recovery on those dates.

Table 7. Simplified payback periods (years)
 

Buckle

Stud

Pendant

Impeller

Manifold

SLA 10%

3.24

2.06

2.43

2.54

2.14

SLA 50%

0.92

0.77

1.13

0.84

0.74

SLA 75%

0.62

0.56

0.79

0.63

0.53

DLP 10%

1.13

0.77

0.22

0.22

0.11

DLP 50%

0.24

0.24

0.05

0.06

0.03

DLP 75%

0.16

0.17

0.03

0.04

0.02

Polyjet 10%

2.83

2.60

2.80

3.24

2.77

Polyjet 50%

0.77

1.45

2.25

1.85

1.65

Polyjet 75%

0.53

1.03

1.59

1.29

1.19

Sensitivity doubles material, labor and energy prices individually. Table 8 Stud DLP COP changes by +108% for labor, −50% for material and −3% for energy; Impeller changes +6%, −34%, −1%. Equal price shocks do not produce equal component responses; overall averages cannot replace part-specific calculation.

Table 8. Cost-COP changes when unit costs double
 

Labor

Material

Energy

SLA

DLP

Polyjet

SLA

DLP

Polyjet

SLA

DLP

Polyjet

Buckle

1%

1%

11%

 − 13%

 − 16%

 − 44%

 − 2%

 − 1%

 − 2%

Stud

90%

108%

28%

 − 45%

 − 50%

 − 67%

 − 6%

 − 3%

 − 2%

Pendant

13%

12%

16%

 − 24%

 − 33%

 − 30%

 − 2%

0%

 − 1%

Impeller

6%

6%

0%

 − 31%

 − 34%

 − 21%

 − 6%

 − 1%

 − 2%

Manifold

4%

4%

3%

 − 37%

 − 40%

 − 28%

 − 5%

 − 1%

0%

Material inflation reduces AM competitiveness, energy has less effect, and higher labor can favor AM because tooling design/manufacture/assembly is labor-intensive. Higher labor also lowers modeled PBP, especially small parts. Printing is not labor-free: mechanical support removal and MJ finishing are included in the comparison.

The injection model needs dimensions, volume, thickness, projected area, surface patches, section type, finish, tolerance and quantity. Geometry affects tooling and operations, not only material. Prior model errors are about 14% for manual small batches and 6% for automated lines; these come from earlier work, not newly testing the full casting chain. The baseline also has uncertainty.

Depreciation includes purchase price, life and discount assumptions; maintenance/space costs are divided by actual hours. Increasing LF reallocates fixed charges rather than accelerating the light source/head. Cost COP shifts with LF, whereas time COP mainly reflects preparation, build and finishing. Thus economics can improve without removing height/nesting constraints on large-part lead time.

Machines include Figure 4 DLP for small jewelry, Genera G2 for larger parts, Form 3L SLA and Objet500 Connex3 PolyJet. DLP cases are not one machine scaled up. Prices, chambers, loading and castable-speed assumptions differ. A larger machine changes capability, purchase cost and hourly rate, so the switch between DLP machines is part of the comparison boundary.

Equipment and operator occupancy differ. Washing/soaking continues with little operator contact, while manual support removal/sanding requires labor. Charging all soaking as labor, or omitting machine occupancy after an operator leaves, biases comparison. Stage-by-stage material/machine/labor/energy allocation identifies which resource bears each time interval.

Bi-log plots cover single to ten-thousand quantities. Curve intersections express equal cost/time under stated inputs, not sudden material-performance changes. Near an intersection, uncertainty, prices and order allocation can shift the decision; integer COPs are model results. Applying the framework to factory data is more informative than copying a threshold.

Limits include few machines per technology, changing performance/prices, no printed transient-tooling-plus-injection route and simplified PBP. The reusable result is a common boundary for size, batch, utilization, finishing and cost variation. A real project should update its equipment, resin, labor and lead-time data rather than treating paper COPs as permanent procurement thresholds.

Source: Sartini, Mikhailo, Favi, Claudio, Mandolini, Marco. Rapid investment casting: a techno-economic analysis for evaluating VAT photopolymerisation processes. 2024-09-24. DOI: 10.1007/s00170-024-14331-y. Adapted from the open-access paper; original figure/table numbers retained. CC BY 4.0.Original paper · Direct PDF · CC BY 4.0 ·